Executive
Summary
The demand of electricity has
increased a lot in last decade and even after putting all out efforts in
increasing the production of electricity it has been realized that by only doing
in this way the increasing demand can not be met by conventional energy sources.
One of the ways of bridging this gap in energy demand and supply is by putting
Renewable Energy Power Plants in rural/semi urban areas, which will assist the
utility grid in providing independent power to a dedicated load. This will
reduce the load on the conventional power systems and results in saving of
precious fossil fuels.
Looking above in mind, Madhya
Pradesh Forest Department has decided to put up 1 Kwp Roof top SPV Power Packs
at 113 nos. remote Forest
Range offices in Madhya Pradesh
for providing uninterrupted power to communication equipments (computers and
wireless system).
The purpose of putting SPV Power
Plant is to provide uninterrupted power to dedicated loads such as computers,
fans, CFL’s and other essential loads. The installation of SPV Power Packs at Forest Range
offices will not only serve the purpose of smooth operation of communication
equipments but will also save conventional energy and fossil fuels thereby more
conventional energy will be available for other applications. The proposed solar
pv power packs will be procured by calling tenders as is required under the GoMP
rules and regulations.
The estimated cost of the project
is Rs 380 Lacs only. The subsidy component is Rs 125 Lacs, while State of
MP will bear 255 lacs.
|